Session 12: Drilling and Completion Optimisation
Monday, 21 April
Room 2
Technical Session
-
1600-1630 224812Uncertainty Analysis of Wellbore Instability: Impact of Parameters Interdependence on Drilling Decisions
-
1630-1700 224776Reducing Well Construction Time and Achieved New Field Record Using an Advanced Intelligent Rotary Steerable System, Onshore Abu Dhabi, UAE
-
1700-1730 224786Improvement of Conductor Driving Operation for Deeper Penetration to Prevent Drive-drill Operation: Cost-effective and Efficient Conductor Installation in Offshore East Java, Indonesia
-
Alternate 224806Revolutionizing Geomechanics with Drilling Dynamics Data: Unlocking the Full Potential of Wellbore Stability
-
Alternate 224811Optimizing Electrical Submersible Pump (ESP) Design and Operation for Low-productivity Gassy Wells
-
Alternate 224778Well Delivery Optimization Through an Eccentric Reamer