Session 12 : Drilling and Completion Optimisation
Monday, 21 April
Room 2
Technical Sessions
-
0330-0400 224812Impact Of Parameter Correlation On Assessing The Risk Of Wellbore Instability And Its Effects On Drilling Decisions
-
0400-0430 224776Reducing Well Construction Time And Achieved New Field Record Using An Advanced Intelligent Rotary Steerable System, Onshore Abu Dhabi, UAE
-
0430-0500 224786Improvement Of Conductor Driving Operation For Deeper Penetration To Prevent Drive-drill Operation: Cost-effective And Efficient Conductor Installation In Offshore East Java, Indonesia
-
Alternate 224806Revolutionizing Geomechanics With Drilling Dynamics Data: Unlocking The Full Potential Of Wellbore Stability
-
Alternate 224811Optimizing Electrical Submersible Pump (ESP) Design And Operation For Low-productivity Gassy Wells
-
Alternate 224778Well Delivery Optimization Through An Eccentric Reamer