Session 45 : Bridging the Gap: Integrating Production, Corrosion, and Logging for Well Integrity
Wednesday, 23 April
Room 4
Technical Sessions
-
1100-1130 224769Impact Of Tubular Wear, Erosion, Deformation And Corrosion On Well Integrity During Extended Reach And Hpht Operations
-
1130-1200 224608Integrating Production And Corrosion Monitoring In Unconventional Environment Getting Conclusive Investigation Of Lower Completion Status Unleashing The Full Potential Through Advanced Logging Techniques
-
1200-1230 224731Proven Successful Case For Long-term Zonal Isolation In A Water Injection Well Under Continuous High-pressure Pumping Using Flexible Ultra-lightweight Cement: A Case Study From Kurdistan, Northern Iraq
-
Alternate 224600Cross-flow Behind The Casing Examination Using Spectral Noise And High Precision Temperature Tool In Partially Cemented Long String Gas Wells
-
Alternate 224635Leveraging Zonal Isolation Index: A Data-driven Go/No Go Decision For Cement Remediation Based On Cement Evaluation Log Analysis
-
Alternate 224593An Orthodox Approach For Using Spectral Acoustic And High Precision Temperature To Improve Performance Of Drilling Operation By Overcoming Fluid Losses
-
Alternate 224641Innovative Applications Of Self-Healing Cement Composites For Wellbore Integrity