Session 45: Bridging the Gap: Integrating Production, Corrosion, and Logging for Well Integrity
Wednesday, 23 April
Room 4
Technical Session
-
1100-1130 224769Impact of Tubular Wear, Erosion, Deformation and Corrosion on Well Integrity During Extended Reach and HPHT Operations
-
1130-1200 224608Integrating Production and Corrosion Monitoring in Unconventional Environment Getting Conclusive Investigation of Lower Completion Status Unleashing the Full Potential Through Advanced Logging Techniques
-
1200-1230 224731Proven Successful Case for Long-term Zonal Isolation in a Water Injection Well Under Continuous High-pressure Pumping Using Flexible Ultra-lightweight Cement: A Case Study from Kurdistan, Northern Iraq
-
Alternate 224600Communication behind the casing examination using Spectral Noise (Chorus) and High Precision Temperature tool in Partially Cemented Long String Gas wells.
-
Alternate 224641A Review of Different Self-healing Cement Composites for Wellbore Integrity