Skip to main content

SPE Logo

SPE Middle East Artificial Lift Conference and Exhibition
29–30 October 2024 | The Gulf Hotel Bahrain | Manama, Bahrain

Loading

Artifcial Lift Reliability 

Wednesday, 30 October
Al Dana 1
Technical Session
Chairperson
Said Dirawi, Artificial Lift Senior Regional Manager - Halliburton
Robert Imbrea, Product Line Manager, Artificial Lift Solutions – KSA and Bahrain - Weatherford
  • 0830-0850 221553
    Automated Control Solutions To Enhance The Beam Pump Performance And Increase The Well Productivity: Block-5 Oman
    S. Al-Badi, Daleel Petroleum LLC
  • 0850-0910 221514
    Fat Vs Sit Mechanical Seal Testing
    G.H. Kappelhoff, ESP Expertise Ltd
  • 0910-0930 221523
    Improved Process For ESP Dismantling, Inspection And Failure Analysis (DIFA)
    R.F. Pessoa, Saudi Aramco PE&D; A. Alsaif, Saudi Aramco; M. Al-khalifa, Saudi Aramco PE&D
  • Alternate 221517
    Embarking On Efficiency: The Evolution Of Esp With Pmm Motor Deployment In Oman's Petroleum Development
    G.N. AL SHUKAILI, S.S. Al-kindi, Petroleum Development Oman; S. Riyami, M. Al Lawati, Petroleum Development Oman (PDO); F.S. Al Hatmi, Y.J. Al Riyami, Petroleum Development Oman
  • Alternate 221568
    A Case Study Of Well Integrity Challenges And Resolutions For The Gas Lift Appraisal Project: How 42 Gas Lift Wells Were Developed Post Mitigation Of Well Integrity Challenges To Meet Double Barrier Compliance
    D. Soni, A. agarwal, adnoc onshore
  • Alternate 221519
    Jet Pump Kick-off: A Sustainable Approach For Wells Compared To Nitrogen Lifting
    A. Alghamdi, Weatherford International Ltd.
  • Alternate 221551
    Understanding The Cause Of Impeller Breakdown In ESP Gas Handlers
    R.F. Pessoa, A. Boudi, Saudi Aramco PE&D
  • Alternate 221559
    Enhancing Reliability In Sucker Rod Pumping System: Understanding Premature Failures And Implementing Sustainable Solutions. Daleel Petroleum-oman
    A. Thabit, S. Al Badi, Daleel Petroleum