Artificial Lift Life Cycle Design and Optimisation
Wednesday, 30 October
Al Dana 1
Technical Session
Chairperson
-
1130-1150 221504A Novel Approach Utilizing Dual String With Esp System To Enable Gas Separator Configuration With Downhole Packers.
-
1150-1210 221522Experience Of Production Increases In High Run Life Wells By The Inclusion Of Pmm Technology
-
1210-1230 221521Reduction In Bp Failure Rate By Introducing Modeled Guide Rod Technology
-
Alternate 221558Shale Gas Field Production Optimisation Decision Making And Intelligent Dewater Productiontechnology
-
Alternate 221524First Success Of Electrical Submersible Progressing Cavity Pump With Y-tool Implementation
-
Alternate 221525Statistical Analysis Of The H2S Impact On ESP Run Life
-
Alternate 221513Optimizing Well Production Through Multiphase Vertical Flow Regime Understanding For More Effective Downhole Gas Separation
-
Alternate 221547Optimizing ESPs In Minutes: Automating Workflows With A THP Vs Surface Rate Approach