Artificial Lift Life Cycle Design and Optimisation
Wednesday, 30 October
Al Dana 1
Technical Session
Chairperson
-
1130-1150 221504A Novel Approach Utilizing Dual String with Esp System to Enable Gas Separator Configuration with Downhole Packers.
-
1150-1210 221522Experience of Production Increases in High Run Life Wells by Injection Optimization and the Inclusion of Pmm Technology
-
1210-1230 221521Reduction in Bp Failure Rate by Introducing Modeled Guide Rod Technology
-
Alternate 221558Shale Gas Field Production Optimisation Decision Making and Intelligent Dewater Production Technology
-
Alternate 221524First Successful Use of an Electricalsubmersible Progressive Pump with a Y-tool Implementation
-
Alternate 221525Exploring the Relationship Between H2s Concentration and Esp Failures: A Retrospective Analysis
-
Alternate 221513Optimizing Well Production through Multiphase Vertical Flow Regime Understanding for More Effective Downhole Gas Separation
-
Alternate 221547Optimizing ESPs in Minutes: Automating Workflows with A THP Vs Surface Rate Approach