Unconventional Artificial Lift Challenges
Wednesday, 30 October
Al Dana 1
Technical Session
Chairperson
-
0115-0135 221515Resolving Rigless ESP Deployment Challenges Using A Modified Coiled Tubing Injector Head
-
0135-0155 221560Optimized Esp Operations: The Impact of Comprehensive Troubleshooting Workflows on Remote and Field Operations
-
0155-0215 221512From Challenges to Solutions: An Innovative Approach to Rod Lift Installation in Difficult Well Conditions
-
Alternate 221548The Optimal and Cost-effective Artificial Lift System (ALS) Combination, Success Case Studies, and Cost Saving Assessment for RRP wells in Oman
-
Alternate 221507Optimizing Well Performance: Leveraging Flow Back Loops for Packer Removal Assessment
-
Alternate 221503Artificial Lift Failures and Operational Challenges in a Chemical Eor Field - A Comparative Analysis of Sucker Rod Pumps and Electric Submersible Pumps
-
Alternate 221541Historical Case of Offshore Application of Booster Esp in Wells with Heavy Oil and High Percentage of H2S and Co2