Unconventional Artificial Lift Challenges
Wednesday, 30 October
Al Dana 1
Technical Session
Chairperson
-
1315-1335 221515Resolving Rigless Esp Deployment Challenges Using A Modified Coiled Tubing Injector Head
-
1335-1355 221560Optimized Esp Operations: The Impact Of Comprehensive Troubleshooting Workflows On Remote And Field Operations
-
1355-1415 221512From Challenges To Solutions: An Innovative Approach To Rod Lift Installation In Difficult Well Conditions
-
Alternate 221548Harsh Well Conditions Production Using Reciprocating Rod Pumping (RRP) System In Oman, Challenges & Mitigation. The Optimal And Cost-effective Artificial Lift System (ALS) Combination, Success Case Studies And Cost Saving Assessment.
-
Alternate 221566Development And Successful Field Trial Of New Developments In Downhole Gas Handling Concepts
-
Alternate 221507Optimizing Well Performance: Leveraging Flow Back Loops for Packer Removal Assessment
-
Alternate 221503Artificial Lift Failures And Operational Challenges In A Chemical Eor Field - A Comparative Analysis Of Sucker Rod Pumps And Electric Submersible Pumps
-
Alternate 221541Historical Case Of Offshore Application Of Booster Esp In Wells With Heavy Oil And High Percentage Of H2S And Co2