21 Innovative Technology: Process Improvements and Technology for Agile and Cost Efficient Oilfield Operations II
Tuesday, 13 May
Meeting Room 10
Technical Session
-
1330-1350 224963Workflow and procedures to create Pore Pressure Prediction Model for Deep Drilling Wells (Pre-drill, While Drilling and Post Drilling)
-
1410-1430 224913Successful Implementation Of Innovative Technologies And Solutions For The Design And Construction Of Heavy Wall Oversized Double Deck Floating Roof Tanks At Maf Tank Farm
-
1430-1450 224960Acid Wash Of Dual-laterals Junction Entry Windows With Near Off Bottom Liner Using 2-3/8" Coiled Tubing With Real-time Downhole Sensors & Multi-lateral Entry Tool
-
Alternate 224985Driving Drilling Optimization With Pioneering Data Recording Technology In Oman's 6.125 In. Bits
-
Alternate 224912Beyond Traditional Stationary Surveying Method: Continuous High-definition Surveys While Drilling Enable Precise Well Placement
-
Alternate 224919Digital Twin Of Multiphase Flow: Unlocking Efficiency In Production Technology Development
-
Alternate 224981Advantages Ofutilizing Early Kick And Loss Detection System In High-pressurehigh-temperature Wells