21 Innovative Technology: Process Improvements and Technology for Agile and Cost Efficient Oilfield Operations II
Tuesday, 13 May
Meeting Room 3
Technical Session
-
0130-0150 224963Workflow And Procedures To Create Pore Pressure Prediction Model For Deep Drilling Wells (pre-drill, While Drilling And Post Drilling)
-
0150-0210 224956Handling Downhole Vibrations With Innovative And Evolutive Cutter-rock Interaction Using Pdc Bit In Directional Application
-
0210-0230 224913Successful Implementation Of Innovative Technologies And Solutions (i.e. High Productive Advanced Mechanized Welding Process(es) With Improvised Designs & Optimizations For Enhanced Safety & Reliable Quality) For The Construction Of Heavy Wall Oversized Tank At Maf Tank Farm
-
0230-0250 224960Acid Wash Of Dual-laterals Junction Entry Windows With Near Off Bottom Liner Using 2-3/8" Coiled Tubing With Real-time Downhole Sensors & Multi-lateral Entry Tool
-
Alternate 224985Driving Drilling Optimization With Pioneering Data Recording Technology In Oman's 6.125 In. Bits
-
Alternate 224912Beyond Traditional Stationary Surveying Method: Continuous High-definition Surveys While Drilling Enable Precise Well Placement
-
Alternate 224919Digital Twin Of Multiphase Flow: Unlocking Efficiency In Production Technology Development
-
Alternate 224981Early Kick And Loss Detection System For Deep Drilling Operations With Narrow Pressure Margins