45 Innovative Technology: Process Improvements and Technology for Agile and Cost Efficient Oilfield Operations III
Wednesday, 14 May
Meeting Room 3
Technical Session
Session Chairpersons
-
0130-0150 225189Maximizing Oil Production In A Brown Field: A Case Study Of Esp Agile Deployment In Ecuador
-
0150-0210 225203Novel Solution To Repair b&C Annuli
-
0210-0230 225198Complex Thru-tubing Fishing Of Non-metallic High Strength Gauge Hanger In Extreme Sour Well Environment
-
0230-0250 225116Achieving Crude Oil Salt Content Specifications With Optimized Washing And Minimal Infrastructure
-
Alternate 225184A Ground Breaking Rigless Workover Approach In Congested Locations: Introducing Hydraulic Workover Unit In Adnoc Onshore To Support Responsible Energy Growth In The United Arab Emirates
-
Alternate 225197Early Production Facility, Monetizing Reserves And Enhancing Field Economics
-
Alternate 225207Eliminating Top Hole Stuck Events In The 12.25 Inch Top Hole Section In Marmul-RTQ Fields.
-
Alternate 225117Optimizing Operations And Overcoming Sand Challenges: The Saber As Advance Tubing Pump Accessories