45 Innovative Technology: Process Improvements and Technology for Agile and Cost Efficient Oilfield Operations III
Wednesday, 14 May
Meeting Room 10
Technical Session
Session Chairpersons
-
1330-1350 225189Maximizing Oil Production in A Brown Field: A Case Study of a Compact Wide-Range ESP Deployment in Ecuador
-
1350-1410 225203Novel Solution to Repair B&C Annuli
-
1410-1430 225198Complex Thru-tubing Fishing Of Non-metallic High Strength Gauge Hanger In Extreme Sour Well Environment
-
1430-1450 225116Achieving Crude Oil Salt Content Specifications With Optimized Washing And Minimal Infrastructure
-
Alternate 225184A groundbreaking rigless workover approach in congested locations: Introducing Hydraulic Workover Unit in ADNOC Onshore to Support Responsible Energy Growth in the United Arab Emirates
-
Alternate 225207Eliminating Top Hole Stuck Events in the 12.25 Inch Top Hole Section in Marmul-RTQ Fields
-
Alternate RPT -224547Optimizing Operations and Overcoming Sand Challenges: The Saber as Advance Tubing Pump Accessories