49 Innovative Technology: Well Integrity Technology III
Wednesday, 14 May
Meeting Room 3
Technical Session
Session Chairpersons
-
0330-0350 225200Replication Of Innovative Well Integrity Technology: Time Activated Sealant In Wellhead Tubing Hanger Leak Application And Control Line Abandonment
-
0350-0410 225158Design And Field Application Of High-strength Ultra-lightweight Flexible Cement Slurry For Zonal Isolation In Water Injection Well: A Case Study From The Khurmala Field, Kurdistan, North Iraq.
-
0410-0430 225088Controlled Particle Size Distribution To Minimize Fluid Migration: A Novel Approach To Ascertain The Wellbore Integrity
-
0430-0450 225220Cement Technique To Cure Artesian Flow In The North Oman Gas Wells
-
Alternate 225191Advances In Gauge Hanger Technologies, Expanding Well Interventions Beyond Conventional Reach
-
Alternate 225142Lost Circulation Plug And Squeeze Using Managed Pressure Cementing To Regain Shoe Integrity
-
Alternate 225127Application Of Impressed Current Cathodic Protection Systems For Well Casing External Corrosion Protection
-
Alternate 225221First Light Wight Cement Slurry Design; Combining Self Supporting Character And Fluid Loss Controlled Property In Single Solution For High Performance Squeeze Job Under Losses Condition.