08 Production II - Flow Dynamics and Assurance
Wednesday, 16 April
Room 209 A
Technical Session
-
0830-0900 224337Field Test Results Of A Downhole Induction Heater For Paraffin Abatement
-
0900-0930 224341Successful Application Of Innovative Technology To Enhance Gas Handling Efficiency And Extend Run Time In Permian ESP Wells: A Case Study.
-
0930-1000 224353Leak Detection Through Transient Flow Simulation In Blended Hydrogen Transportation Systems
-
1030-1100 224344Multiphase Flowmeter Reduces Capex And Opex And Enhances Flow Assurance In The Uinta Basin
-
1100-1100 224326Gravity Segregation And Gas Well Deliquification
-
Alternate 224325The First Worldwide Dynamic Solution For Iron Sulfide Removal Using Coiled Tubing
-
Alternate 224350Strategic Design Optimization Of Co2 Pipeline: A Case Study For Lobos Pipeline In New Mexico