Emergence of Data Science, Reduction of Carbon Footprint, and the Value of Interventions in Increasingly Constrained Drilling Market
Wednesday, 26 March
Waterway 4
Technical Session
This session will showcase new technologies and data-driven methodologies designed to improve the effectiveness, carbon footprint and the operational efficiency of well interventions. In our industry, data collection and analysis have long been pivotal in enhancing the effectiveness of interventions both on the job and for future operations. Recently, the emphasis has shifted from merely gathering data to exploring its potential applications. Data science is rapidly permeating all facets of our lives, and the well intervention sector is no exception.
-
0100-0125 224037AI-Powered Coiled Tubing Pipe Design Optimizer
-
0125-0150 224089Coiled Tubing Equipment Evolution To Overcome The New Well Intervention Challenges On The North Slope Of Alaska
-
0150-0215 224095The Key To Reliably And Efficiently Installing Casing Patches With Coiled Tubing: Practices From An Indonesian Campaign
-
0215-0240 224086Novel And Sustainable Approach For Norm Scale Removal With Coiled Tubing Milling And Cyclonic Desander System To Restore Tubing Accessibility And Restore Production From High Scale Prone Wells
-
0310-0335 224065Analyzing Coiled Tubing Stuck Pipe Events And The Implication Of Understanding The Stuck Mechanism
-
0335-0400 224057Operational Improvements Using A Light Work-over Rig And Concentric Coiled Tubing Vacuum Technology Delivered An Optimized And Cost-effective Cleanout And Stimulation
-
0400-0425 224045Advanced Wireline Conveyance Modeling Powered By Physics-informed Neural Network
-
0425-0450 224078Transformation Of Well Intervention And Abandonment Operations Planning Into A Digital Workflow
-
Alternate 224050Mitigating Shock And Vibration In Coiled Tubing Drilling By Combining Big Data Analytics With Physics-based Modeling
-
Alternate 224041Enhancing Well Intervention Strategies: A Data-driven Framework For Water-shutoff Candidate Selection And Post-treatment Assessment
-
Alternate 224094Restoring Well Productivity: Leveraging Instrumented Coiled Tubing And Through-Tubing Inflatable Packers For Optimized Waterflood Sweep Efficiency - A Successful Injector-to-Producer Pilot In The Wara Reservoir, Kuwait
-
Alternate 224055Optimizing E-line Milling In Oil & Gas Wells: A Mathematical Optimization Approach
-
Alternate 224035Pilot Coiled-tubing-conveyed Long Propellant Sleeved Perforation Gun In Highly Deviated Wells
-
Alternate 224048Harnessing Artificial Intelligence And Automation For Next Generation Real-time Monitoring Services And Interventions