Skip to main content
Loading

Novel and Light Well Intervention Solutions: Doing More With Less

Tuesday, 25 March
Waterway 4
Technical Session
This session explores the most innovative solutions and technologies to address the most complex deepwater well intervention challenges. As the industry faces increasing operational complexities and environmental challenges, experts will share insights on cutting-edge methods that push the boundaries of traditional practices. Topics will include evolution of the riserless operations in the GOM, several innovative applications that have expanded the boundaries of wireline interventions, plug and abandon deepwater campaign from LWI vessel, and an exciting electrical driven coiled tubing unit application. Join us for a dynamic discussion that will equip attendees with the knowledge to navigate the future of deepwater operations and enhance safety, efficiency, and sustainability in offshore wells and subsea environments.
Session Chairpersons
Jose Noguera - Baker Hughes
Luis Castro - Baker Hughes
  • 0115-0140 224044
    The Evolution Of Riserless Wireline Subsea Interventions In Deepwater Gulf Of Mexico, Doing More With Less
    S.E. Townsend, bp; J. Duenas, L.W. Ramnath, BP America Inc
  • 0140-0205 224074
    Electric-driven Light Coiled Tubing Unit Unlocks New Intervention Potential Through Efficiency In The Norwegian Continental Shelf
    A. Keong, A. Casali, SLB; G. Todnem, V. Haugstvedt, Equinor AS
  • 0205-0230 224091
    Coiled Tubing Downlines Corrosion And Preservation Experience From Extended Riserless Light Well Intervention Campaigns
    R. Mammadli, bp America Inc
  • 0230-0255 224084
    Anatomy Of Two Wireline Tractor Intervention Train Wrecks
    H.C. Castillo, Wireline Advisory Board LLC
  • 0325-0350 224079
    Integrated Telemetry, Flow Simulator, And Data Visualization Software Streamline Cleanout Operations With Coiled Tubing
    F.J. Fajardo, SLB; F. Jahn, Services Techniques Schlumberger; K. Austbø, Equinor
  • 0350-0415 224030
    Subsea Multiwell Hydraulic Intervention Stimulation Campaign Single Stage Sandstone Acidizing On Long Horizontal Drains
    C.J. Okpalla, TotalEnergies; L.A. Riolfo, Total Energy Solutions Company LLC; E. Asibor, Total E&P; M. MOHAMED, TotalEnergies SA; S. Bremner, N. Felix, P. Artola, SLB
  • 0415-0440 224113
    Electro-Hydraulic Pulsing Technology (EHP): From The World’s First Successful Safety Valve Remediation To Expanding Applications - A Decade Of Successes, Failures, And Insights
    K.M. John, TotalEnergies SE
  • Alternate 224082
    Rigless Intervention Pipe Expansion Method To Seal Gas Or Fluid Leaks
    J. Foerstner, Workover Solutions Inc; B. Murphy, J. Rairigh, W T Bell International; A.W. Camponeschi, Nicor Gas
  • Alternate 224056
    Successful Robotic Bullnose Milling In Horizontal Offshore Well Gaining Access For Open Hole Logging
    J. Nobile, S. Shiwam, A. Rout, S. Kumbhar, Welltec Oilfield Services Doha LLC
  • Alternate 224076
    Light Weight And Small Surface Equipment Footprint Circulation System For Nitrogen Pumping: Sharing Insights On Tangible And Intangible Value Creation Through Successful Nitrogen Pumping Application For Well Unloading Operation.
    A. Abu Bakar, Petronas Carigali Sdn Bhd
  • Alternate 224085
    Maximizing Efficiency: Single-run Multi-cluster Ct Perforation And Acid Squeeze In Horizontal Wells Using Hydraulic Delay Systems
    W. Tapia, N. Molero, M. Naveed, M. Alyami, SLB