Session 3: Drilling, Well Completion and Workover Technologies and Solutions to Monetise Marginal and Mature Fields
Session Managers: Nurul Ezalina Bt Hamzah, PETRONAS; Agus Jayadi, SLB
The session calls for industry experts, leaders, and engineers from various background to discuss and share the cutting-edge technologies and ingenious solutions revolutionising the optimisation of marginal and mature field operations. The session delves into the subject of drilling, well completion, well intervention and workover techniques, spotlighting advancements that propel cost-efficiency, enhance reservoir recovery, ensure safe asset management, and enhanced hydrocarbon production.
Key topics include but not limited to;
-
Drilling - Latest innovations in drilling methodologies, equipment, and automation systems designed to streamline operations, minimise downtime, and enhance drilling performance in challenging environments.
-
Well Completion - Novel approaches and technologies in well completion, such as intelligent completion, inflow control device, multilateral wells, zonal isolation techniques, and fit for purpose strategies aimed at maximising reservoir contact and flow paths, mitigating production risks as well as optimise well cost. Apart from Hardware, a fit for purpose and economic stimulation technic, can be incorporated as part of completion to remove damage hence enhance the production.
-
Well Intervention and Workover - Technologies and methods tailored to rejuvenate aging wells, reactivate idle wells, revitalise production, and extend asset lifespan while minimising operational disruptions and costs. A mode of artificial lift (eg: velocity string) can also be considered as part of the operation.
-
Asset Integrity - critical challenges related to asset integrity management (includes Well P&A), wellbore integrity, and HSE standards in the context of maximising returns from marginal and mature field developments.
-
Overall Monetisation Strategies - Innovative integrated models (contracting, FDP or the management of producing wells) that encompasses all aspects of drilling, well completion and well intervention as an example and partnership frameworks that benefits marginal fields development and production.
Discussion Leaders:
- How Velocity String Campaign Eliminates Intermittent Production issues in Three Depleting Gas Wells in a Gas Field: Case Study from India by Ankur Mittal, Ops Manager, Weatherford
-
Enhancing Oil Production Sustainably through an Innovative Single-Stage Sandstone Acidising Fluid: A Case Study from Offshore Malaysia by Azmin Hartme Bin Abdul Majid, SLB & Timur Tashkenbaev, Petronas Carigali Sdn Bhd
-
Managing Matured Field Production with an Accurate Production Allocation Determination by Azzad Hafiz bin Abdul Latif, TGT Diagnostics