Skip to main content

SPE Logo 

SPE WORKSHOP
Wells Integrity, Intervention and Workover Solutions

8–9 October 2024 | Kota Kinabalu, Sabah, Malaysia

SPE Logo

SPE WORKSHOP
Wells Integrity, Intervention and Workover Solutions

8–9 October 2024 | Kota Kinabalu, Sabah, Malaysia

Featured Presentations

Subpage Hero

Featured Presentations

Featured presentations are updated as of 4 November 2024. Additional approved slides by the discussion leaders will be updated on this site by 8 November 2024 (if any). Feel free to revisit the site for further updates.

SESSION 2: DATA ACQUISITION AND SURVEILLANCE

Early Detection, Early Action: The Power of Proactive Surveillance in De-Risking and Streamlining Decision-Making in a Complex Brownfield Maturation by On Chee Khong, Petrophysicist, Brunei Shell Petroleum

Effective Reservoir Management with Permanent Downhole Gauges (PDHGs) by Dennis Liew Reservoir Engineer, Brunei Shell Petroleum

Well Intervention in High Pressure Well Using Production Logging-Capacitance Array Tool (PL-CAT) Survey Successfully Identify Water Zone in Northwest of Labuan Offshore Sabah by Mohd Amri Zulkifli, Account Manager, Neu Dimension Bid (M) Sdn Bhd  and Nur Zulaikar Md Jusoh, Well Intervention Executive, PETRONAS Carigali Sdn Bhd

SESSION 4: POSTER SESSION

Crossflow Detection To Allocate Production By Using Spinner, Spectral Noise And Temperature Modelling In Malay Basin by Zaim Zakwan Zainal Abidin, Petrophysicist, PETRONAS Carigali Sdn. Bhd.

Repair of Production Packer Leaks Riglessly Using Thermosetting Resin by Mohammad Aale Soufi Haji Awang Mohd. Yakub, Completion & Well Intervention Wells Engineer, Brunei Shell Petroleum

Enhancing Well Integrity Through Advanced BPV Milling by Ahmad Rashid Ahmad Zaini, Wells Integrity Engineer, EnQuest Malaysia

Unlocking Idle Well in Small Platform with Pilot Application of Dual Wireline Technology by Amir Irfan Mahra, Well Intervention Engineer & Production Technologist, PETRONAS Carigali Sdn. Bhd.

Fluid Sampling And Ion Analysis: Faster, Cheaper, And Unitless Well Subsurface Integrity Test by Khalifa Al Hinaai, Well Integrity EngineerPetroleum Development Oman

SESSION 5: PRODUCTION ENHANCEMENT AND IDLE WELL RESTORATION

Optimising Longevity: Maintenance Practices for Continuous Production in Mature Water Injector Wells by Mohammad Faizal Ali, Operation Engineer Coiled Tubing & Pumping Services, Neu Dimension Bid (M) Sdn. Bhd.

Diverting Challenges into Success – BaSO4 Scale Removal and Gaining Access to Reservoir for Successful Zonal Isolation and Additional Perforation – A Case Study by Mohd Shahrizal Hashim, Staff Engineer – Well Services, PTTEP Malaysia

SESSION 6: EFFECTIVE WELL INTEGRITY MANAGEMENT

Strategising Wells Plug & Abandonment with a Novel Approach: Balancing Technical and Commercial Fortitude with Unwavering Industrial Compliance by M Zahin Abdul Razak, Executive - Well Abandonment, PETRONAS Carigali Sdn. Bhd.

SESSION 7: POSTER SESSION

Well Integrity Redefined: Centralised Digital Management Solutions by Muhammad Imran Ratasha, Subject Matter Expert - PE Data Analyst, AEM Energy Solutions Sdn. Bhd.

Evolution of Realtime Coiled Tubing in Malaysia by Mustafa Hakimuddin, Project Manager, SLB

SESSION 8: CHALLENGES IN MANAGING MATURED/LATE LIFE ASSETS

Coiled Tubing Intervention Extending Beyond Short String for a Dual String Completion: Future Norm to Restore Idle Wells by Kung Yee Han, Technical Advisor, Neu Dimension Bid (M) Sdn Bhd 

Practical and Cost-Effective Solutions for Well Integrity in Mature Fields with a Risk-Conscious Approach by Abdul Afif Osman, Well Integrity Engineer, PETRONAS Carigali Sdn. Bhd.

Downhole Erosion Risk Management: Technical & Operational Guidance Flowchart Based on API 14E by Muhammad Izzat Irfan Ahmad Tajuddin, Wells Integrity Engineer, Exxonmobil Malaysia

 

Sign up for the newsletter